FENCE VRSATEC - WORKING PROCEDURE

FENCE VRSATEC - WORKING PROCEDURE

Instructions for constructing fence parts of the Vršatec fence system.

Súbory na stiahnutie

WORKING PROCEDURE

  • BASIC LAYER 

The construction of the fence is performed on a solid concrete foundation according to the building standard and with a width of 30-35 cm. Subsequently, the base is glued with an asphalt insulation tape (IPA). We pre-drill holes for concrete reinforcement (roxor) in the place where the columns are placed. Each part has the numbers 0 to 5 on the top and bottom for easier identification.

  • CONSTRUCTION OF WALLS AND COLUMNS  

From the basic parts 1 to 4, we assemble rectangles for the construction of columns. We connect the parts with a wire that is embedded in each piece so that they do not divide during assembly and pouring of thick concrete. At the connection point of the walls, we use parts with a cut-out. For example, if we connect a wall at the height of two rows (wall height 40 cm) we use a part with a cut-out 1V and 3V, because we place the subsequent column rectangle on top of each other (upside down) to prevent the pattern from being repeated. For mutual gluing of parts, we recommend a flexible cement adhesive, which we apply in a reasonable amount to prevent it from being pushed outwards. After fitting the first part of the column, we can continue to connect the wall. It can start with straight part 0 (0-1-2-3-4-5) or in case of another row, part 5 (5-4-3-2-1-0). We continue to lay the parts of the wall in the sequence 0-1-2-3-4-5, while we check the horizontal and longitudinal evenness using a slat. We glue the rear (back) part of the wall in exactly the opposite order as the front side, i.e. in the order 5-4-3-2-1-0, in this way the individual joints are overlapped and thus ensure the strength of the wall. Before laying the next piece of the column, we wipe the inner corners with glue to prevent the concrete mixture from leaking out, which are later used to pour the columns. After placing three rows on top of each other, we insert steel reinforcement (roxor) into the drilled holes and pour the column with semi-dry concrete approximately to the middle of the last row. In the same way as before, we build another row of walls, taking care that the subsequent row is always opposite (upside down) to the one below it in order to avoid repeating the pattern. Also in the case of columns, we make sure that the subsequent row is always rotated by 180 degrees and then the next one is also opposite (upside down). This gives 4 different looks and limits the repetition of the pattern.

  • ENDING 

We will finish the construction by gluing the column and wall caps. After cleaning and hardening of the glued joints, we recommend treatment with a hydrophobic solution for concrete products. For example, Lukofob 39 diluted with water in ratio 1:10 (1 part Lukofob and 10 parts water). Such a single coat treatment protects the surface and facilitates cleaning for approximately 5-7 years. Finally, we complete the fence with a filling according to personal preferences.

FENCE VRSATEC

Assembly Instructions

Video instructions for building a fence system - from the foundations to laying the concrete covers.